Some details of the Safety Plan and Coordination
The PSC is specific for each individual site;
is prepared according to the type of site that will be made, then through a careful analysis with reference Nalle design choices of the designer of the building to be built.
the psc is prepared by the coordinator for the design, which carries out the procedures that companies should follow in the yard and fill the operational safety plan (POS)